Road opening permits

When you need a Road Opening permit from Council

If you carry out works involving digging up a footpath, nature strip or roadway, you must apply for consent from the Coordinating Road Authority. 

VicRoads is the Coordinating Road Authority for all freeways and many arterial roads. Council is the Coordinating Road Authority for other streets and laneways in the municipality.

You need to apply for a Road Opening permit from Council to dig in any part of the road reserve which is managed by Council. This is required when works impact roads, laneways, Council-managed car parks, nature strips or footpaths.

Works which need a Road Opening permit include excavations, trenching or core sampling, connecting water, gas or stormwater, and soil testing.

If you are temporarily working in the road reserve, but not performing any form of excavation, you require a Temporary Road Closure permit

Determining which authority is responsible for a road

You can search the Maps of Declared Roads for any road within Victoria and determine if it is a freeway, arterial road or a municipal road (shown as local roads). You can also contact Council to confirm if Moreland City Council or VicRoads is responsible for the road in which you intend to work. 

If your works impact a VicRoads managed road you may require a permit from VicRoads. Please refer to the VicRoads Guide to Working in the Road Reserve for more information. 

The role of the works manager

When you apply for a Road Opening permit, you need to specify the works manager.

A works manager is defined by the Road Management Act 2004 as the person or body that is responsible for conducting the works in, on, under or over a road.

Responsibility for reinstatement of the road reserve following the works defaults to the works manager, unless another party is nominated.

The permit applicant is often the works manager.

Fee

Lodging a Road Opening permit application incurs a fee, which is set by the Victorian Government.

See Road Opening permit fees for current fees.

How to apply for a Road Opening permit

What you need

To obtain a Road Opening permit from Council, you need to provide:

    • a Traffic Management Plan
    • a copy of your public liability insurance to the value of $10 million
    • the date(s) and times the works will occur, and
    • details of who to invoice for the permit (including ABN).

Apply online

  1. If you are a registered user, sign in to Online Services. As a registered user, you won't need to enter your personal information each time and can keep track of requests and applications on any device.
  2. Apply for a Road Opening permit online. Have digital files ready to attach to the application.
  3. As part of the online application process, the fee is paid online by Visa or MasterCard. See Road Opening Permit fees to determine your relevant code number and associated fee.

Apply by post or in person

  1. Collate all the required documentation including the Road Opening permit application form (XLS 72Kb).
  2. Post the documents to Moreland City Council, Locked Bag 10, Moreland VIC 3058, or deliver in person to the Moreland Civic Centre, 90 Bell Street, Coburg. You may also fax all items to 9240 1205 (attention Transport)
  3. Once we receive the application, Council will review the application and issue you with an invoice for payment.

What happens after you apply

A minimum of 4 working days is required to process the permit application.

Council assesses all applications for a Road Opening permit based on traffic management principles set out in the Road Management Act 2004 Worksite Safety – Traffic Management Code Of Practice and AS 1742.3 - 2002 Manual of Uniform Traffic Control Devices.

This, by no means, places any responsibility for the effectiveness of traffic management being implemented by an independent works manager or contractor upon Moreland City Council.

On-site auditing of Traffic Management Plans

Moreland City Council Transport Engineers carry out random traffic management audits of works being undertaken on any Moreland road asset.

These audits are conducted using the checklist as set out in the Road Management Act 2004 Worksite Safety – Traffic Management Code Of Practice.