Site search

Accessibility tools

Text size

Quick links

Weather

Early Fog Followed by Sun. Cool. Currently 11.7°C Wind N 24.1km/h
Tomorrow
Mostly Sunny. Mild. 8 - 18°C

Feedback

If you require a response from Council, visit our feedback page.

 

Legal point of discharge

The legal point of discharge is a point specified by Council where stormwater from a property must be discharged. The legal point of discharge is usually Council's stormwater drain, where available, or street kerb and channel. 

Council is regularly requested to give direction on the legal point of discharge for both existing properties and the redevelopment of residential, commercial and industrial developments. 

Get the legal point of discharge

The location of the legal point of discharge from an allotment must be obtained for an application for a building permit. 

  1. Complete the Request for Point of Discharge Report application (DOC 80Kb)
  2. Attach a site plan to your application, except for Council drains external to property.
  3. Bring or send your application and documents to Council with the report fee below.

Report Fee

Get the legal point of discharge from Council at a cost of:

  • Single dwelling $56.75
  • Multi-units including dual occupancy $56.75
  • Commercial/Industrial/Public building $56.75, or
  • Commercial/Industrial that includes residential dwellings $56.75

Files 

  • Arabic
  • Chinese
  • Croatian
  • Greek
  • Hindi
  • Italian
  • Spanish
  • Turkish
  • Vietnamese

This is the official website of Moreland City Council © 2008

Locked Bag 10, Moreland, Vic. 3058, 90 Bell Street, Coburg, Vic. 3058 Australia

Phone (03) 9240 1111 Fax (03) 9240 1212 Email info@moreland.vic.gov.au