Facility design
A range of considerations have influenced the design including the existing structure, heritage, environment space, community priorities and costs.
The facility design has been developed by a project architect Henderson and Lodge, and a team of consultants, together with Council.
Plans and Photos: Brunswick City Baths redevelopment
- Site plan including temporary gymnasium (PDF 1Mb)
- First floor plan (PDF 3Mb)
- Temporary gymnasium (PDF 1Mb)
- Temporary gymnasium works in progress (photo) (JPG 59Kb)
If you can't download or use PDF documents please contact Council.
Artist's impressions: after the redevelopment

Current redevelopment pictures
Waterplay Pool Design
The Waterplay Pool will be a fun space with a range of depths and features to suit babies through to young children. It is part of the indoor aquatic area and will be open all year round.
View the video of Waterplay Pool features below.
Comment on the design
Many members and users have influenced the facility design through Council consultations.
Further comments can be made by emailing Miranda Markovic, on 9240 1111.
